Automatic Work Kyrgyzstan Used Roof Tile Sheet Machinery

Solution description of Automatic work Kyrgyzstan employed Roof Tile Sheet CZPT

   Glazed tile roll forming machine is a single of our primary items, it is far more and a lot more well-known in recent years because it truly is gorgeous in visual appeal & special in style. We are a quite expert manufacturer of glazed tile roll forming equipment, with mature technique and far more than 23 years’ expertise, our devices have been despatched to several international locations all all around the globe and acquired a great track record for us.
    This sort of device is extremely common and widespread employed in latest many years

Equivalent device possibly u like:

Functioning method

     The total line consists of decoiler, forming machine, pc controlling program and run out tables. Our devices are geared up with a pc managing system to keep items precise.

Main parameter

NO

            Type

Specification

one

Uncooked materials Sort PPGI
Feeding materials width 914/one thousand/1200/1220/1250 mm
Thickness .three-.8 mm or as customer’s ask for

2

Decoiler Operation Handbook
Weight apacity 5 Tons

3

Primary physique Roller station 13 row
Diameter of shaft seventy five mm
Shaft content 45# with .05mm chrome
Roller content 45# with .05mm chrome
Kind Chinese sort
Body 350mm C-beam
Body thickness 16 mm
Content Cr twelve
Procedure CZPT automated
Doing work velocity Typical three-5 m/min and servo motor 6-10m/min

four

Electricity Driving way 1.two inch chain
Principal motor five.five KW
Pump station electrical power 7.five KW
Voltage 380V/50HZ, 3 phase

five

Control box CZPT box PLC management method, inventer
PLC brand name Delta manufactured in ZheJiang
Inverter model Delta made in ZheJiang
Language Chinese and English

Handbook decoiler
It is passive sort could load coil by expend the blots repair at coil interior diameter. It’s effortless to function and inexpensive solution. 
Xihu (West Lake) Dis. system
Adopt guiding bar and sliding block to manage the width and place of the steel sheet. The coil is guided in the correct placement and handed to the roll forming program. Can modify the guiding bar with loosing the correcting bolts to feed sheet in correct place. It is fastened composition to make certain can not move effortlessly. 
Roll Forming Method: 
Roll forming program consist of equipment body, transmission method, electrical motor and roll forming method. 
A. Machine frame adopts welding structure with shot blasting and painting therapy
B. All rollers content adopt substantial high quality No. 45 metal, with tough chrome coated on floor, all treatment by total CNC equipment, to make positive the rollers with very good rigidity and precision, and form ideal roofing sheet as for every layout. 
C. All rolling shafts are produced by large good quality No. forty five steel with quench and mood treatment, so the shafts with very good rigidity which could use for long tern CZPT deformation. 
D. Rolling shafting supporting structure variety is metal wall and welded with the basement collectively to have rigidity. 
E. Cycloidal pin gear pace reducer motor pushed, the back again/CZPT roller driven by chain, component of higher/reduce rollers pushed by gear
F. Modify the screw bar manually to change the length among higher/reduced rollers for variation thickness of sheet. 
(Attention: all rolling technique has modified in our company as a perfect predicament, we never suggest to alter the rollers at random, if necessary, need to change by a experienced technician or following practice by our engineer. In any other case will trigger the equipment can not kind a good profile
Reducing gadget
A. Adopts post slicing, the reducing blade substance is Cr12 with quenched treatment method, right after slicing, there is no substance squandered. 
B. Adopts welded frame for good rigidity. 
C. The chopping motion is droved by the electrical power from hydraulic station which ensures the procession of the cutting and lower noisy, long daily life. 
CZPT Program
It is controlled by equipment wheel oil pump. Right after filling the hydraulic oil into the hydraulic oil tank, the pumps travel the cutter device to begin the slicing job. 
The program includes a set of hydraulic tank, a set of hydraulic oil pump, two hydraulic pipes. And two sets of electromagnetism valves. 
Energy of the oil pump: 3kw
CZPT oil: 40#
PLC manage technique 
It adopts industrial computer to control. The focus on piece’s duration is adjustable and digit of it can be adjusted. Computed method has two modes: automatic and handbook 1. The method is easy to run and use. 
Processing precision: inside of one.00mm
It includes liquid crystal monitor, programmer, transformer for the electronic devices and kits of every part. Contact monitor
PLC is ZheJiang Panasonic
Transducer model is ZheJiang  Delta
The vendor must supply Chinese and English language display
Counter
One particular counter gauges size, pulses, and decides duration. 

Work methods

To check out equipment video or a lot more particulars, speak to with me

We device promote to heaps of international locations

Our certificate

Organization data

   CZPT group is a professional maker developing and creating roll forming machines proven in June 1996. We have four factories functioning in ZheJiang , ZheJiang and ZheJiang province. More than 400 workers give services for u.
     Products largely include trapezoidal steel roof/wall panel equipment, C&Z form purline machine, highway guardrail equipment, sandwich panel manufacturing line, deck forming device, C U L gentle keel device, shutter slat doorway forming equipment, slicing device, downpipe device, gutter device, and so on.

How to pay a visit to us?

Our support

1. Free specialized help and free of charge components offer.

two. Engineer CZPT to support machinery abroad.

three. One 12 months warranty is offered.

4. Long life technological direction for free.

five. We always supply technological assist, fast response, all your inquire will be replied in 24 several hours.
 

Issue & Response

1. Q: How to visit our company:

     A: Fly to ZheJiang  Airport: By fast train From ZheJiang South station to HangCZPT west station

(1hour), then we can pick up you to factory(40min).

     B: Fly to ZheJiang  Airport: By fast train From ZheJiang  Xihu (West Lake) Dis.ao station  to HangCZPT west    

station(4.5 hours), then we can pick up you to factory(40min).

two.  Q: What need to I give if I want to CZPT equipment?

     A: U need give profile drawing, content, thickness, voltage and your special requirements.

three.  Q: What is the Warranty?

     A: Within 12 mounts, all technicals are ready to provide you at any time.

4.  Q: What can you do if the machine broken?

     A: Our machine’s guarantee period is 12 months, if the broken elements are unable to restore, we will send

new areas replace the broken elements cost-free, but you require pay the express expense if right after guarantee time period. we can negotiate to remedy the difficulty, and we provide the specialized assist for whole lifestyle of tools.

five.  Q: If need technician to workshop to debug and instruct, how to do?

     A: We despatched technician to your place to correct the device. Buyer must bear cost such as: visa, round excursion ticket and suited lodging, also buyer ought to spend the salary 100 USD/day.

 

Automatic Work Kyrgyzstan Used Roof Tile Sheet Machinery